KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  8-8-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Collective tasks - 01

Finished cockpit prep for engine control cables. Modified the cabin heat cover to allow the cables to go through the heater vent area and then through the firewall These three holes are from bottom to top; carb heat, mixture and throttle.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.