KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  7-7-2015
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Update - 02

While waiting for the ELT and to work on the aft section, I moved to the forward area. I installed the brake calipers on both wheels (torqued to 100 inlb) and fabricated the two hydraulic lines that run from the firewall to the brakes. The first one was not so hot, the second much better. Both servicable but the first one does not look as nice as the second.

All the work that can be done pre-engine installation is done. It is time to hang the motor.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.