KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  4-25-2015
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Week update - 01

Updating the log for the week's activities. The network cable needed an Adel clamp as it passed the bellcrank cover. Made a small angle, used a nutplate and TA DA; an Adel clamp was installed.
Wired the flap motor with a connector at the motor. Not sure I like this installation and I will probably pull it out and do it again. A while ago I putchased Van's electrical kit. It comes with a wiring harness, but for just a basic aircraft. So I have been pulling wires out of the harness and installing them. For example it had two wires for the flap motor. That is what I used for this installation. More on the harness later.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.