KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  9-27-2014
Number of Hours:  2.50
Manual Reference:  
Brief Description:  More work - 02

Ran wiring through the conduit to the tail section for the trim servo and the aft position light. In image one you can see the strobe cable (previously installed) and the position light wire running through an Adel clamp over the next to last bulkhead.

In image two you can see the servo wire bundle and the aft position light as they exit the conduit. The wires from left to right are the servo bundle, the position light and the strobe bundle (it is grey.)

Image three has the servo bundle and the position light exiting the conduit at the baggage coompartment. They will continue to the panel in the channel in the lower right.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.