KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  8-20-2013
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Pressure testing the right wing

Pressure tested the rght wing today. I decided to leave the wing in the wing storage rack instead of moving it to a workbench. It was very difficult to get to the vent fitting to attach a ballon. After a few trys I decided to fabricate a small fitting to attach the ballon. You can see the small aluminum tube connected to the fuel vent. Once connected I pressurized the tank and using soapy water I checked for leaks. None. I checked five hours later, still no leaks.
' style=

Inflated

Inflated

' style=

A view of the fitting

A view of the fitting

' style=

Five hours later

Five hours later

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.