KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  11-28-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Bulkhead F-705

Started by cutting the bulkhead to length, then cutting the doublers to length and trimming them to size. There is a shim/doubler that needed to be fabricated that supports the bulkhead (see photos.) Next I clamped the F-705 B section, the bulkhead and the doublers together to drill to size. After double checking all the rivet hole alignment, I moved on to the seat belt brackets. I finished the first one of four when I finished for the day.
' style=





' style=

Drilling the doublers

Drilling the doublers

' style=

Shim in place for drilling

Shim in place for drilling

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.