KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  4-17-2014
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Cabin work and fiberglass

Lots of little projects as I get closer to working on the canopy. There were four tooling holes in the cabin frame I decided to fill. Not required, but it makes the frame look a tad bit nicer. I filled them yesterday, so today was sanding and priming. The photos make the primer look splotchy. Not sure way, it must be the lighting.

I have been sanding the elevator and HS tips. I sand a little bit every few days. That way the sanding process does not be come overwhelming. There were several pin holes that needed to be filled so yesterday I filled. Today I sanded and filled in some more. I believe tomorrow I will have a near finished product. I need to order UV smooth prime so I can prime those parts.

The rest of the day was spent fabricating several small parts required for the structure forward of the instrument panel.
' style=

Left side of cabin frame

Left side of cabin frame

' style=

Top center of cabin frame

Top center of cabin frame

' style=

Parts for forward section

Parts for forward section

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.