Finalized the pitot / AOA lines running from the front of the aircraft to the Dynon system aft of the baggage compartment. The conduit has been installed, running from the F-706 bulkhead, under the baggae compartment and under the pilot seat pan to just aft of the flight controls. I also ran the Pitot / AOA lines. Just in case I need to pull these out and reinstall them at some future date, I am fabricating an access panel for that side of the baggage floor.