KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  9-2-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Aircraft systems - 04

Today I just wanted to get ready for the deliver of the finishing kit. It is suppose to arrive tomorrow. I moved the aircraft and parts around to ensure access and placement for future work. With the finishing kit arriving I needed to organize the remaining steps to be completed. I spent an hour jotting down tasks to be completed. There are about fifteen system oriented tasks, some multistep, that I wrote down.

I also got the elevators and horizontal stabilizer (HS) down, dusted them off, and started planning their installation. It is really looking like an airplane. One of the elevator tasks is to drill the horns for the attachment of the pushtube. I clamped and strapped the elevators and HS to a workbench so they are ready to work on. Image three shows the elevator horns. The plans call for drilling the aft most horn first. It is hard to see in the photo, but the left horn is slightly aft of the right horn.
' style=

Left side for F-7114 gussett

Left side for F-7114 gussett

' style=

Elevator horn set for drilling

Elevator horn set for drilling

' style=

Left horn appears to be slightly aft

Left horn appears to be slightly aft

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.