KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  9-1-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Aircraft systems - 03

I started drilling the F-7114 gussett to the fuselage on both the right and left sides. To ensure it is in the correct place I placed four bolts through the gussett and the center section. Drilling, and clecoing, one at a time; I drilled up to #30. I have to drill up to an #11 for an AN 3 bolt. But tasks at home made me stop for the day.
' style=

Riight side prior to drilling

Riight side prior to drilling

' style=

Right side from the outside

Right side from the outside

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.