KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  8-22-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Static and vent systems.

With limited time I worked on just a few items. I finished connecting and sealing the static ports in the back of the aircraft. I prosealed the connections for the static line and the static ports. I also connected the static line to the T connector. I slid a small piece of 1/4" tubing over the top of the connection to provide additional strength and pressure to hold the line in place. Nothing will be tugging at it, so the lines should be good.

I have decided to pressure test the pitot tube and AOA lines in my wing before sealing the wing. I want to make sure they are not leaking before riveting the skin on. I will also pressure test these connections as well.

I continued working on the fuel vent line.
' style=

Left static port

Left static port

' style=

T connecter

T connecter

' style=

Fuel vent

Fuel vent

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.