KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  3-25-2012
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Fuselage work continues - 6

Worked on a few things today, so due to photo limitations I put them in three entries. This is the bell crank that is part of the elevator flight control. Photo one shows it after I riveted the two sides to the bearing. I had prepped the parts last week and only need to rivet it together, make two spacers and temporarily install it to check the fit. Photo two and three shows the bell crank installed and photo three the spacers I made for it.
' style=

Bell crank riveted

Bell crank riveted

' style=

Bell crank temporarily installed

Bell crank temporarily installed

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.