KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  3-23-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Fuselage work continues - 4

Today is split into two entries due to the three photo limit. First task was to finish drilling the seat belt attaching points, I jumped ahead on the instructions and drilled the four gussets to the aft two bulkheads. I knew I would finish the day priming a few parts and I wanted to include those in that batch.

Image one shows the holes in the longeron for the seat belt attaching bracket. Image two and three show the four gussetts in place and drilled to size.
' style=

Seat belt attaching point

Seat belt attaching point

' style=

Aft gussets

Aft gussets

' style=

These gussets are on the next bulkhead forward

These gussets are on the next bulkhead forward

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.