Working around the 4th of July festivities I managed to finish drilling the longerons. I did not count them by there must be over 200 per side. I lot of rivets to set at some point in time. The plans call for drilling up to the F-704 bulkhead, then double checking the alignment of the longerons with the F-770 skins. I got to this point and called it a day.