Today I finished the deburring, dimpling, etc of the center section with the exception of the ten rivet holes in the F-704 bulkhead that need countersinking. These ten rivets need to be double flush set, that is flush set on the inside and outside. That is first tomorrow, then I start assemblying the center section.