KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  12-22-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  More fiberglass...it will never end

With all the Christmas preparation I only got two hours to work on the project. I was productive. I layed up the fiberglass on the inside of the second HS tip, I completed the filling of the first HS tip with the microballon slurry and I developed a plan for finishing the front edge of the elevator arm. All of this would make more sense if I remembered to take photos. Tomorrow.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.