KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  2-13-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Sand, sand, sand

Worked on the lower cowling by sanding, sanding and sanding some more. Probably spent 3.5 hours just block sanding. I wanted to remove the excess epoxy and get down far enough so the surface was smooth. At the end of the day I had made about 75% progress of where I wanted to finish. After working on the whole thing it became apparent I needed one more application of epoxy.

I laid down one more thin layer on everything but the bottom of the air scoop and its sides. That area is bad enough I will need to mix some microballons and spot fill. Image three shows the cowling curing, notice the shiny surface every where except the air inlet. I believe this will get me to the point of using a filler primer.

I also checked the fit of the two radios with the t-channel. I will need to take about 0.20 off the t-channel for the fit I want and I will need to place the comm 1 radio one top of the Garmin 400W.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.