Took a small break from wiring to start the baffling. I need to decide on routing of the wires running forward through the firewall wall and the baffling has an impact on those decisions. For example the oil cooler and its hoses drive where the oil pressure and fuel transducer wiring runs are located. Once the baffling is done I will get back to wiring.