KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  10-14-2015
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Engine controls - 01

Two entries summarizing the last few activities. Finished the panel layout and am getting the panel ready to ship to UpNorth Aviation so they can cut it.

Started on the firewall. Need to finish the engine controls passthroughs and get the firewall insulation installed. Sooo, I jacked up the aircraft and pulled the engine mount and gear off the aircraft. That meant fabricating a stand to put the aircraft on. Then I started pulling stuff off the firewall.

I fabricated a doubler/patch for the brake reservoir. The orignial was damaged so I had to get another, when it arrived the hole layout was different. So that is fixed now.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.