KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-17-2019
Number of Hours:  3.00
Manual Reference:  
Brief Description:  New cooling tube for battery

Installed a few fitting in the baffling to support a 1" blast tube and fabricated a mounting braket for the tubing. The bracket provides for a clamp and holds the tubing in the correct location.
' style=





' style=

Bracket moounted

Bracket moounted

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.