KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  1-22-2017
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Update

No photos. December and most of January has been busy with other tasks besides building an airplane. However I have finally gotten back to work. Tasks down are:

1. Wired pitot heat and tested. Also connected heat indication, this will be tested with the EFIS
2. Wired USB ports and tested, these are ports for power.
3. Ran wiring for ELT panel, needs connector
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.