KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  7-11-2016
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Baffling

Been out of town so I am giving a multi day update in one shot. I pulled all the baffling back off the aircraft for some final work. I added blast tube openings for the magnetos and the alternator as well as the opening for cabin and carb heat.

There was some final fit adjustments made to the baffling behind cylinder three up against the crankcase as well as out by the cylinder head. I also added some support to the seam where the forwad cylinders' baffles meet the respective ramps.

Finally I took the baffles home for prep and priming. The images show the material back at the hangar ready for assembly.
' style=

Primed and ready for assembly

Primed and ready for assembly

' style=

Right ramp with opening for alternator blast tube

Right ramp with opening for alternator blast tube

' style=

Left ramp with opening for altenate air and heat.

Left ramp with opening for altenate air and heat.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.