Date:  12-18-2015
Number of Hours:  20.00
Manual Reference:  
Brief Description:  Long over due update

Lots of work has been completed with few photos for the build log. I will attempt to record what I have been working on for the last few weeks.

Wiring - I have fabricated and finished installing wiring for the starter, starter contactor, alternater power and field wires, ANL 60 AMP fuse, battery contactor and engine to frame ground. As well as the oil pressure, oil temperature, fuel pressure and CHT sensors. The EGT won't be done until after the exhaust is installed which is after the cowling. So all sensors and system wiring has been run up to the sub-panel. The supporting switches and fuse blocks are installed. Next is the slow process of running the wires to the approriate switch and to ground forest of tabs on the firewall.

Engine systems - all the appropriate oil lines are installed and one of the fuel lines. I need two fuel lines made to support the red cube fuel transducer. Those will be ordered through TS Flightlines. The oil cooler will have to wait until the baffling is completed which is done after the cowling.

Wings - My good friend Doug J. flew up and spent a day and a half helping me with the project. With his superior sheet metal skills we were able to close up the bottom skins of the wings, double check the rigging on the elevators (I thought I had a problem, but did not) as well as some tap and die work I had put off.