It is kind of interesting how long some little tasks seem to take. To ensure the ELT antenna cable did not rub on the fuselage, pitot / static system or the shoulder harness cable I needed to fabricated a location to attach an Adel clamp. Simple idea, lengthy implementation.
Added "tech wrap" around the wires from the OAT prop for protection and replaced two nuts with nutplates to ensure maintainability.
Waiting on a new antenna coax cable and to fabricate the GPS feed to the ELT before riveting aft skin.