More Dynon work. Drilled the mounting holes for the ADAHRS, there is enough play that I can make minor adjustments for alignment purposes. I thought I had every pneumatic connector known to man, but I am missing three 90 degree connectors. Once they are ordered and here I can trim the tubing to size.
The JBWeld did not hold the wire ties, so I mixed some proseal (what a mess that makes) and put them back on. I received the gascolator bracket for the firewall, so that is next. In fact I will pull the sub-panel, install the gascolator and the doubler for the master relay on the firewall. There are a few rivets I need to get done before putting the sub-panel back in, then it will be time to rivet the sub-panel.