KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  11-2-2014
Number of Hours:  2.50
Manual Reference:  
Brief Description:  More Dynon wiring work - 02

Temporarily and loosely zip tied all the wiring in place up to the center section. I have the net cable running to the subpanel as well as the trim cable. I working on getting the ADAHRS in the correct position so it will be ready to install. Really that is it for the aft wiring. I have a few terminal blocks to attach to the floor under the passenger seat. Once I finalize my design I will attach those and run the wiring.

Next is riveting the sub-panel and then Sika flex the canopy.
' style=

Temp zip ties to hold wiring in place

Temp zip ties to hold wiring in place

' style=

Getting the ADAHRS is the correct position

Getting the ADAHRS is the correct position

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.