KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  2-16-2014
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Canopy frame - 01

Worked on fabricating / assemblying the aft canopy frame. This rather beefy section doubles as a roll bar in the unwanted event of the aircraft arriving upside down. As usual I did not take photos along the way. So two pictures of it assembled and drilled, one of everything back apart for deburring, countersinking (for flush rivets) and some limited priming.
' style=

Assembled and drilled

Assembled and drilled

' style=




' style=

Apart and ready for deburr, etc

Apart and ready for deburr, etc

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.