KitLog pro

Powered By Kitlog Pro v2.0

Scott's Aircraft Build Logs
' style=
Date:  10-30-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Initial fitting of the empennage fairing

Worked on the initial fitting of the tail fairing. It does not fit very well as shipped. It almost seems as if the fairing was twisted in the mold. It will take lots of sanding and shaping.
' style=

Left side

Left side

' style=

Lots of gaps

Lots of gaps

' style=

Even worse

Even worse

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.