Several tasks completed on the wing today. Finished the pressure test of the left wing, no leaks. Added a rubber washer under the tie down to protect the paint (when the aircraft is painted.) I tapped the hole just a little further to ensure the tie down was tight against the washer. Connected all the pitot tube connections and made sure sufficient antichaff protection was in place to protect the lines.