Worked on a few tasks on the fuselage while waiting for the tank test. I had two more bolts located in the center section that needed to be torqued. That took a lot longer than it should have, almost an hour. They were in a hard to get to location. But they are done.
I am using the Vans blind rivet static port. I drilled the hole to size and riveted the static port. I also put a small amout of RTV around the back of the rivet to provide a seal against the skin. After setting the rivet I drilled out the mandrel so the static line can be connected.
Finally I installed the seat belt attaching hardware to the aft longerons.