Today I worked on several items all needed to be completed before riveting the bottom skins. Items completed were; torqued the bell crank to wing spar attaching bolts, finsihed attaching connectors to the Dynon pitot tube heat control box (to include a function check) and finalized the bend requirements for the pitot tube aluminum tubes. My wife helped me put the right wing on the bench so I can mount the aileron and get ready to rivet the skin.