|
|
Sid & Houston Mayeux Project
|
Date: 9-15-2014
|
Number of Hours: 1.50
|
Manual Reference: Oil Door
|
Brief Description: Cowling oil door, part 1
|
|
I want to finish the inside of the cowling, but first I must fabricate and install the oil door. I bought the hidden-hinge oil door and Camloc hinges from Avery Tools. Instead of using the flimsy fiberglass sheet that came with the Vans kit, I'll fabricate a much beefier door out of sheet alclad.
First I shaped an inner door panel out of 0.063" alclad, cut to fit the size of the cowling door hole. I then positioned, matchdrilled, and cleco'd the door hinge assembly to the cowling frame. Finally, I clamped the 0.063 panel to the hinge assembly positioned inside the door hole, match-drilled, and cleco'd the panel to the hinge plate.
|
|
Positioned and drilled hinge plate
|
|
Positioned oil door outer panel, match-drilled
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |