Brief Description: Aligned and up-drilled LH Ribs 1-9
Aligned and up-drilled LH Ribs 1-9 (including spacers). Realized that I had used -6 aft and -5 fwd ribs to make -1 thru -5 aft ribs and -1 thru -4 fwd ribs as used to be required before kit upgrade (plans weren't clear on this), even though the ribs were already pre-made as part of the kit. Arranged with Sonex to use -5 aft ribs as -6 aft ribs. Also arranged to exchange the 8 ea aft and 8 ea fwd unused pre-made ribs for 8 ea std -6 aft ribs and 8 ea std -5 fwd ribs. Leave it to me to make things harder than they had to be....