Worked on the canoy braces. The harded part was forming the stiffening flanges on the 9 holes. Got inside and drilled the braces with the canopy installed with a flashlight and mirror. A few holes will be drilled with the canopy off due to the proxiimity. Ordered two fans for defogging.