I declared it IFR study week last week and knocked out the second and thrid ground school phase test. I also got the practical part of my first phase one check for the flying portion. Saturday afternoon per manual I broke out the attach hardware for the wing strut. I then drilled/ reamed/ deburred the attach holes. Then bolts and washers and locknuts went into place. I left them loose and will torque them later. I left the torque wrench back in Dad's shop I'll get it next trip back or forth.