I figured out the length of screws necessary for the side attach brackets. I got them tight and ready to torque down. I also tightened the AN4 bolts which hold the aft attach brackets in place and started drilling the pilot holes up to #10 and countersinking the outside of the shell. I also rough cut the bulkhead C, D and E material for trimming to size.