KitLog pro

Powered By Kitlog Pro v2.0

Schroeders Sportsman
' style=
Date:  10-28-2012
Number of Hours:  2.80
Manual Reference:  
Brief Description:  Aft Tunnel #5

I layed up the lower joint of the walls first let that jell cure then did the forward and aft joint on both sides. As always I made sure to peel ply the layups. I took a dremmel and ate away some of the foam on the edges of the cargo floor. I mixed up a batch of QCell and epoxy and filled in the edges of the cargo floor. It came out well. :-)
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.