KitLog pro

Powered By Kitlog Pro v2.0

Schroeders Sportsman
' style=
Date:  8-25-2010
Number of Hours:  1.20
Manual Reference:  p74
Brief Description:  Bulkhead B BDM

I started working the BDM material around the circumference of bulkhead B. The best technique I have worked out is to lay the peel ply down on my layup table then wet out the BDM. Be sure to do it from the bottom of the material. Then I wet the bulkhead and fuselage with a bit of resin. I take the wetted BDM and apply. The peel ply is not as malleable as the BDM but I do the best I can there. The important bit the BDM is down and tucked into the radius well.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.