I did a lot of initial alignment and fitting for the VS. I ended up centering a laser level on the cage and shot a vertical line on the leading edge of the VS. Then dropped a plumb line from the center of the spar to the center of the tail cone. I worked it until I had everything sync'ed up. Then I drilled it per plans and called it a day. Tedious work but she is looking good.