Began to close R elevator. Got spar done. Rivet gun slipped with two more to go and go a dent on the top. Was able to hammer out most of it. Got down to the trailing edge and extruded aluminum piece drilled and countersunk. Ready to prepare the angle. I will probably glue it together and finish it up when we get back from Oregon. Then I will have the hinge pin to bend and attach the elevators to the HS etc.