KitLog pro

Powered By Kitlog Pro v2.0

Rob's REBVAIR Project
' style=
Date:  11-12-2009
Number of Hours:  20.00
Manual Reference:  Chapter 12
Brief Description:  Floor install and outside corner wraps

Well the floor channels are finally rivetted in! After countless hours (I estimated 30) of cutting, drilling, fitting, deburring, and priming, everything is all buttoned up. Image 1 shows the channels in position. I added one reinforcing channel right behind the seats because I am placing at least one forward facing seat behind the front seats, and I am expecting the rear passenger to step right onto this spot. Also, several channels have been "doubled" to capture the rivets to be used for the seat rails. Image 2 is the right side complete, and a shot of the left side in image 3. After one year of work, it's very satisfying to see the cabin and tail cone finally come together. Next up....inner floor....then controls!
' style=

floor and channels rivetted

floor and channels rivetted

' style=

right wraps

right wraps

' style=

left wraps

left wraps

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.