Brief Description: deburring and priming floor components
Given my limited cleco collection (~300 of each size), I don't have the luxury of temporarily holding both the lower and top floor skins and channels together. So I need to rivet the lower floor skin and channels together before tackling the top skin. This is also tedious work, complicated by the fact that I need to keep track of which pieces goes where (especially non-descipt clips). I could label them, but cleaning, sanding, and priming the parts would wipe away such markings. I am carefully laying out pieces on the workbench so as not to loose track.