KitLog pro

Powered By Kitlog Pro v2.0

Rob's REBVAIR Project
' style=
Date:  12-2-2008
Number of Hours:  2.50
Manual Reference:  Chapter 12
Brief Description:  re-fabricate top FUS29

Sequence showing refabrication of top FUS29. Starts with the transfer of rivet holes to a piece of lexan (image 1). You treat the lexan the same way you would a sheet of aluminum. Then you lay the lexan on top of the blank and keep it flat while you transfer all the holes (Image 2). Finally, if done correctly, the final oversized aluminum sheet is test fitted to the fuselage (image 3). If you look closely you can see the forward attach fitting sits perfectly against FUS36 bulkhead.
' style=

Transfer of rivet holes to lexan

Transfer of rivet holes to lexan

' style=

lexan to blank FUS29

lexan to blank FUS29

' style=

new FUS29

new FUS29

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.