KitLog pro

Powered By Kitlog Pro v2.0

Rob's REBVAIR Project
' style=
Date:  12-7-2019
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Torque tube final install

Time to drill out all the holes on the torque tube caps for the ailerons. These were indexed when the wings were on, but now need full drilling out to 3/16" and stainless rivets. Also necessitated the final rivetting of the torque-tube attach stabilizing channels (Image 3). Though not shown here, everything is now buttonned up.
' style=





' style=




' style=

roof channel also rivetted

roof channel also rivetted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.