KitLog pro

Powered By Kitlog Pro v2.0

Rob's REBVAIR Project
' style=
Date:  3-13-2019
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Sight gauge fuel bung install

Also added two additional fuel port bungs to the wings to provide better sight gauge readings. Was relatively simple to drill the holes and prep the surface for final install with the fuel sealant.

Images are of each wing, at different stages of completion: Image one is right wing before final install. Image 2 is left wing after final install.
' style=

Bung clecoed in place and surface prepped

Bung clecoed in place and surface prepped

' style=

installed with the 2-part fuel sealant

installed with the 2-part fuel sealant

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.