KitLog pro

Powered By Kitlog Pro v2.0

Rob's REBVAIR Project
' style=
Date:  6-14-2016
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Windshield Install Part 2

With the windshield fitted (including the bottom rubber edging), the other areas are trimmed/dressed to in preparation for glassing the bottom retainer.

Everything is taped with blue painter's tape, and then instead of the wax paper prescribed in the manual, I used packing tape as a mold release.

Image 2 shows strips of tape I used the folded inwards, and then another piece of tape to apply tension and fix to the panel. This provides down/inward pressure on the windshield.

I also drilled one #40 cleco hole to hold the windshield side on. Not to worry, this area of the windshield will be trimmed completely off at final assembly.
' style=

blue and packing tape

blue and packing tape

' style=

tensioner tape

tensioner tape

' style=

one cleco to hold onto the side

one cleco to hold onto the side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.