KitLog pro

Powered By Kitlog Pro v2.0

Rob's REBVAIR Project
' style=
Date:  3-1-2014
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Top cowling attach: Part 2

Here you see a close-up of the aft and front attach points. You can also see the stringer I added to the top of the piece to eliminate some oil canning I was observing 3/4 of the way from front (curved) to rear (flat) surfaces. The stringer really did the trick here. There's also a wooden stick visible in the second photo that is acting as a spacer between the starter and the cowl while the cowling is being built and shaped.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.