KitLog pro

Powered By Kitlog Pro v2.0

Steve's CH750 Cruzer (N750SB)
' style=
Date:  5-23-2017
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Installed main wheels, attached mains to fuselage

Finished assembling the 2nd main tire onto rim. I ordered some AeroShell 22 lubricant, so temporarily installed the wheels onto the main spring without packing the bearings. Installed the main landing gear assembly onto the fuselage and temporarily secured with nuts from Lowes. This shifted the CG backwards again , but with some pressure added to the nose, Sierra was on its wheels for the 1st time.
' style=

Main gear temp installed

Main gear temp installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.