KitLog pro

Powered By Kitlog Pro v2.0

Steve's CH750 Cruzer (N750SB)
' style=
Date:  7-6-2017
Number of Hours:  1.25
Manual Reference:  
Brief Description:  Map box

I partially assembled the map box. Riveted the interior and back only. Since I plan for the panel to fold down, I can't directly rivet the box to the panel, I will need some supporting structure and the door only will be attached to the panel. Having the box assembled will be of use later when I lay out the panel and plan the avionics shelf and support.
' style=

Partially assembled

Partially assembled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.