KitLog pro

Powered By Kitlog Pro v2.0

Steve's CH750 Cruzer (N750SB)
' style=
Date:  2-25-2017
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Drilling gear weldements

This was weldement day. Applied masking tape to weldements and extended rivet lines. Drilled #40 holes through weldement and into structure. Removed weldements and upsized holes to 3/16 except for the 2 on each weldement that needed 1/4. Added holes on weldement wings for A5 rivets. Inside cabin, cut and drilled the 2 L angles that attach to the gear channel and cabin side. Incrementally drilled to #20 in the weldement. Drilled the starboard weldement for the seat angle holes. Didn't get to finish the other one today.
' style=

Pilot drilling weldement to fuselage

Pilot drilling weldement to fuselage

' style=

Lots of holes to get the weldement drilled

Lots of holes to get the weldement drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.